Baukey configurator
Pergola configurator
Plan your freestanding timber pergola – with a deck underneath if you like. Cut list, timber list, hardware and assembly guide are generated from your dimensions.
Overall size (L × D × H)
460 cm × 350 cm × 276 cm
6 posts
Headroom 240 cm
Assembly on the model
Tap a step – its parts light up in the model.
Sample configuration – adapt everything to your garden.
Check
- Because of the length, 6 posts are placed automatically (centre spacing 194 cm).
- The sections are rules of thumb for an open pergola without roofing. With a roof, shade sails, climbing plants or high snow/wind loads a structural check by a professional is required. Check permit requirements with your local authority.
Sketches from the guide · 20
These sketches come from the general text guide and do not necessarily show your configured dimensions.
1Site Survey and Layout

Measure the intended area carefully to define the pergola footprint. Use strings and stakes to mark the exact outer corners. Verify the rectangularity by measuring the diagonals; these must be identical. Use marking spray to mark the exact centers for the four point foundations.
2Utility Clearance

Before starting excavation work, ensure that there are no underground utility lines. Obtain utility plans from the local provider and use a professional detection device. Under no circumstances dig if lines are suspected or detected in the area without first consulting an expert.
3Foundation Excavation

Excavate four pits at the marked positions using a motorized earth auger or a manual post hole digger. The depth must be below the local frost line to ensure structural stability. Keep the diameter of the pits constant to ensure uniform concrete distribution.
4Drainage and Base Preparation

Fill the bottom of each hole with a layer of crushed stone. Compact the stone thoroughly to prevent subsequent settling of the foundation. Ensure the base provides a level surface for the post anchors.
5Positioning the Post Anchors

Place the steel post anchors into the holes and align them precisely with the layout strings. Use a spirit level to ensure that each anchor is absolutely vertical. Fix the anchors with temporary wooden bracing to avoid movement during the concreting process.
6Concreting

Mix the concrete of strength class C20/25 and pour it into the foundation holes around the anchors. Use a rod to remove air pockets from the concrete. Smooth the surface with a trowel so that it slopes slightly away from the post to avoid water accumulation.
7Curing Time

Let the concrete foundations cure for a certain time after setting, depending on the outside temperature. Do not put any load on the anchors during this time. In extreme weather conditions, cover the concrete with plastic foil to ensure a uniform curing process.
8Post Installation

Mount the posts onto the steel anchors using galvanized bolts. Check the vertical alignment of each post from two perpendicular sides using a spirit level. Secure the posts temporarily with diagonal braces to maintain the position during the installation of the upper frame.
9Timber Preparation

Measure and mark all beams, rafters, and braces according to the construction plans. Cut the components to the exact dimensions using the chop saw. Sand all cut edges with sandpaper to minimize surface area for moisture absorption and prepare them for the application of wood preservative.
10Surface Treatment

Apply at least two coats of weather-resistant wood preservative to all wood surfaces. Pay special attention to saturating all end-grain surfaces, as these are most prone to rotting. Ensure the wood is completely dry before starting the assembly.
11Dry Fitting

Perform a dry assembly of critical connection points on the ground. Check if all notches and connections fit together without force. Ensure that the hole patterns for the screws match the pre-drilled markings on the wood parts to guarantee a seamless final assembly.
12Pre-drilling

Drill pilot holes for all screw and bolt connections using the correct diameter for the respective fastening material. This step is essential to prevent the wood from splitting when driving in the structural screws. Keep the holes straight using a drill guide or a high-precision drilling machine.
13Mounting the Longitudinal Beams

Lift the beams onto the post heads with the help of a second person. Align them correctly and secure them with the provided threaded bolts and washers. Tighten the nuts with a torque wrench according to the values indicated in the structural plan.
14Mounting the Crossbeams

Position the crossbeams at right angles onto the longitudinal beams. Use joist hangers or angle brackets to fix them securely. Ensure that the spacing between the beams is uniform over the entire length of the structure.
15Structural Bracing

Install the diagonal braces between the posts and the longitudinal beams. Use structural screws to fasten them at both ends through the pre-drilled holes. These braces are crucial for the lateral stability of the pergola and must be mounted with precise symmetry.
16Rafter Mounting

Distribute the rafters evenly across the crossbeams according to the plan. Screw them to the crossbeams using structural timber screws. Verify that all rafters have identical overhangs on both sides for balanced aesthetics and uniform load distribution.
17Connection Check

Carry out a final inspection of all bolts, screws, and connectors. Re-tighten all fasteners that may have loosened during the assembly process. Confirm that the structure remains level and rectangular despite the weight of the installed wood elements.
18Final Surface Inspection

Check whether scratches or damage to the protective coating occurred during handling. Touch up all unprotected areas with additional wood preservative to ensure complete protection against environmental influences. Let the repairs cure completely before finally releasing the construction site.
19Site Cleanup

Remove all temporary bracing, wood scraps, and construction debris from the site. Dispose of all materials according to local recycling and waste disposal regulations. Ensure the work area is left in a safe and clean condition.
20Structural Acceptance

Invite a qualified specialist or the local building inspector to verify the completed construction against the structural calculation documents. Ensure that all legal documents and permits are correctly updated and archived. Never exceed the permissible weight loads on the structure.